PU Stone Installation Guide

Section 1: Tools You Need

🧰 Measuring Tape & Level
πŸ“ For accurate measurements and straight lines.

✏️ Pencil / Chalk Line
For marking guidelines on the wall.

πŸ”ͺ Utility Knife / Handsaw
To trim and cut panels to fit edges.

🧴 Construction Adhesive + Caulking Gun
For strong bonding to the wall.

πŸ”¨ Finishing Nails (Optional)
For extra hold, especially on edges.

πŸͺ΅ Sandpaper / Filler
To smooth edges and fill small gaps.

Section 2: Step-by-Step Installation

1️⃣ Prepare the Surface – Clean, dry, and flat wall. Mark guidelines with a level.
2️⃣ Apply Adhesive – Apply glue in β€œS” or zig-zag pattern on back of panel.
3️⃣ Position the Panel – Press firmly, adjust before adhesive sets.
4️⃣ Secure (Optional) – Add finishing nails on edges for extra hold.
5️⃣ Trim & Fit – Cut panels for corners, outlets, or edges.
6️⃣ Finishing Touches – Fill gaps with caulk, sand if needed.

Section 3: Pro Tips for Best Results

  • Start from the bottom corner and work upwards.
  • Mix panels from different boxes to avoid color shade differences.
  • Let adhesive cure 24 hours before cleaning.

Section 4: Watch & Learn